Artificial Quartz Stone Production Line stone carving machine
Product Description
Introduction of Artificial Quartz Stone Production Line
The artificial quartz stone production line is mainly composed of hopper, conveyor, mixing system, crusher machine, material distribution machine, press machine, solidifying oven, test machine, etc. The test machine is the prototype of the core parts of the whole plant, with which the recipe can be tested by forming artificial quartz stone slab samples, volume production will only be made after successful tests. The process of the entire line is, weight the raw materials (quartz powder) by the hopper, send them to the mixer by the conveyor, add to auxiliary material (e. G. Resin), mix individually and mix all-together, distribute material in the distribution machine, put the mixed material into press, vacuum vibration pressing and shaping, solidify in solidifying oven.
Model | Grinding head number | Maximum width of the Plate(mm) | Maximum thickness of the Plate(mm) | Total power(kw) | Spindle motor power(kw) | Conveyor motor power(kw) | Swing motor power(kw) | Dimensions(L*W*H)mm | Weight(t) |
|
8LM100 | 8 | 1000 | 50 | 100 | 11 | 3 | 4 | 7600×2700×2460 | 9 |
8LM170 | 8 | 1700 | 50 | 100 | 11 | 3 | 4 | 7600×3400×2460 | 11 |
8LM190 | 8 | 1900 | 50 | 100 | 11 | 3 | 4 | 7600×3600×2460 | 12 |
12LM170 | 12 | 1700 | 50 | 150 | 11 | 3 | 4 | 9800×3400×2460 | 15 |
12LM190 | 12 | 1900 | 50 | 150 | 11 | 3 | 4 | 9800×3600×2460 | 17 |
16LM170 | 16 | 1700 | 50 | 200 | 11 | 4 | 5.5 | 12200×3730×2460 | 19 |
16LM190 | 16 | 1900 | 50 | 200 | 11 | 4 | 5.5 | 12200×3930×2460 | 23.5 |
20LM190 | 20 | 1900 | 50 | 250 | 11 | 4 | 6 | 16300×3930×2460 | 32 |
1. Raw material:
SiO2(powder), Crushed glass or others,
Resin,
Solidifying agent,
Accelerator,
Toner:
** SiO2(powder)+ Crushed glass or others > 93%
**Resin 6-9%
2. Rough slab width: 1650mm;
3. Rough slab length: 3250mm;
4. Rough slab thickness: 15~40mm;
5. Total powder (approx. ): 440KW;
6. Productivity: 1 slab / 4~5 min
1286m2/day (Work time: 20 hours)
32150m2/month (Work day: 25 day)
385800m2/year (Count as the work time with 20 hours per day and 300 days per year).
Clients Visiting
Packaging & Shipping
To be packed in standard packing, wooden form.
Includes on-site basic operation and maintenance training.
Anything I can do for you, please just kindly let me know:
Fulfil your need is my job, my friend!